A yes vote for a more walkable Gaslight Village

Give Gaslight Village room to grow. Vote yes for shared, off-street parking.

Off-street, structured parking helps Gaslight Village stay compact, walkable, convenient, and welcoming. A shared garage is the best choice for growing East Grand Rapids: it serves school and downtown destinations together instead of spreading parking across valuable land.

Illustrative image of a green traffic signal on an urban street.

Why vote yes

Put parking in one place. Keep Gaslight Village walkable.

Compact, off-street parking is the best fit for a growing downtown. One shared facility can serve school and community destinations while keeping more of Gaslight Village focused on businesses, homes, public spaces, and people.

One facility serves the whole day

School users, event visitors, workers, and shoppers do not all arrive at the same time. Shared parking puts one set of spaces to work for more people, instead of building separate lots for every use.

Build up, not out

Structured parking stacks spaces in one footprint instead of spreading parking across the ground. That is a stronger foundation for a compact downtown with room for local businesses, homes, trees, and public space.

Make streets work better for people

The ballot explicitly authorizes pedestrian and micromobility safety infrastructure. The City’s resolution connects the parking hub to a broader vision of reallocating some street parking for dedicated mobility lanes. Pairing the garage with safer crossings and routes makes this a walkability investment, too.

Read the corrected bond language →

A compact plan for a growing Gaslight Village

Make parking convenient—and keep downtown compact.

A shared, off-street garage is the best way to serve the high school and Gaslight Village while keeping parking in one place.

−71

Projected net campus spaces after renovation

This is the school-renovation scenario without replacement parking. The shared-garage proposal is designed to replace school spaces and add shared capacity.

City Manager’s figure, reported by FOX 17 →
  • Parking near Gaslight runs fuller. At 3 p.m. on all three survey dates, a selected set of nearby City and curbside locations was 6–10 percentage points more occupied than the full study pool.
  • The Saturday count ended at 5 p.m. The D&W lot reached 161 of 213 spaces (75.6%) at the final reading—its highest observed count. The survey did not measure dinner or evening parking.

The 118/111 reading is the City’s March 12, 2025 count for Area 15, Lake Dr. (Senior Lot). The net-loss figure was reported by FOX 17 from City Manager Shea Charles; it describes the school plan without replacement parking. For the 3 p.m. comparison, the selected 127-space set combines Bagley street, Croswell City lot/street, and Wealthy street; it is a manual grouping, not a City-defined area. Percentages for nearby/all sites were 65.4/55.7, 52.8/45.6, and 73.2/67.1 across the three dates. The City surveyed two weekdays 8 a.m.–6 p.m. and one Saturday 11 a.m.–5 p.m.; it did not count Saturday evening. See the City map and raw tables, pp. 7, 19–51 and EGRPS Joint Parking Subcommittee.

The real tradeoff

What’s the drawback? The cost is real.

This is a major public investment. The question is whether one compact shared facility is worth the cost—and whether East Grand Rapids wants to keep adding scattered parking or build a better long-term home for it. We believe the shared garage is the best choice.

Some of the loudest claims in circulation—statewide crime shares or unverified allegations about campaign vendors—do not answer whether this local investment is worthwhile. Traffic and access deserve a sound design; the central voter tradeoff is the public cost versus the value of serving the school and downtown together.

Project estimate

The $9 million bond is not the full project cost

The ballot authorizes up to $9 million in City borrowing. The latest City estimate for the roughly 240-space concept is $15.247–$16.906 million in 2026 dollars, or $16.333–$18.110 million if bid in 2028, depending on design option.

The City’s preliminary financing sheet estimates $13.212 million in total bond payments over 20 years, including interest.

Bond resolution and financing · July design and cost update

What households pay

Tax depends on taxable value

The preliminary estimate is an average 0.4925 mills over the bond term—about $49.25 a year per $100,000 of taxable value. The estimated first-year rate is 0.5922 mills, or $59.22 per $100,000 of taxable value. That is a household-specific tax impact, not a flat amount per resident.

The project price, bond debt service, and ongoing maintenance are different costs. The City and school partnership is the right way to share the long-term bill.

The City’s earlier operating estimate was about $130,000 a year for a smaller 213-space concept, before depreciation. The roughly 240-space design needs an updated operating estimate.

The school need

The City’s count shows a school-lot shortfall at peak

In the City’s latest published baseline, the four high-school lots held 211 vehicles in 216 marked spaces at 1 p.m. on March 12, 2025 (97.7%). One 111-space lot was counted with 118 vehicles—seven more than its marked capacity. At that measured peak, the high school did not have enough marked spaces in that lot. The City forecast a temporary 139-space reduction beginning in June 2026; the City Manager later described a projected 71-space net loss after renovation without replacement parking.

The records document peak-time pressure at the school and a planned net loss; they do not include a post-construction count. A shared facility can serve that need and Gaslight Village together.

City area counts, pp. 19–22 · Progressive school-parking memo

Why it came later

The 2023 school plan was not a parking-replacement plan

EGRPS presented the 2023 bond around classrooms and school improvements. The City’s earlier 2018 study had said area-wide parking was sufficient; later City records say high-school expansion and planned mixed-use development made a new look necessary. A citywide supply finding was not a plan to replace school spaces at the high school.

The records do not assign blame or give one explicit reason for the omission. They show why the parking impact became clearer as the school design and construction phasing advanced. See the 2023 bond scope · City parking history

The case for yes, grounded in the record

A stronger downtown starts with a smarter parking plan.

A shared garage is the best way to bring school and downtown parking together. The public record helps explain why that makes sense—and how to make the full vision work.

Parking supply

Available spaces are not all convenient spaces

The City’s area-wide count found spaces open at the measured times. The total pools curb, school, and private/open-to-public inventory, so it cannot tell us that each space is convenient or available when a visitor needs it.

Read the City study →

Traffic and LOS

LOS F describes delay—not safety

Level of Service measures traffic delay; FHWA says it does not measure safety. WalkSafe’s linked PDF does not show the claimed grade or delay tables. The May school presentation says traffic adjustments were analyzed and a signal was required, but does not publish the analysis. The intersection is a design challenge—not a reason to abandon a compact shared garage.

WalkSafe traffic claims · FHWA on LOS

Cost

Know the full investment behind the bond

The ballot authorizes up to $9 million in City borrowing. The July update estimates $15.25–$16.91 million in 2026 dollars and $16.33–$18.11 million if bid in 2028. A shared project should have shared costs and a clear operating plan.

Bond resolution · July cost update

Safety and street design

Pair shared parking with safer streets

Curb parking creates dooring and turning conflicts for people biking. The ballot explicitly includes pedestrian and micromobility safety infrastructure. The City’s resolution describes a vision of reallocating some street parking for dedicated mobility lanes; it does not name a specific Lake Drive route. The yes vision pairs a central garage with safer crossings, protected or buffered routes, and clear access for people walking and biking.

FHWA parking and bikeway guide · Bond language

A safer street is part of the yes vision

Move parking off Wealthy. Make room for safer rides.

Cars parked along Wealthy put opening doors and pull-out movements beside people biking and scootering. Moving selected curb parking into the shared garage would make room for a protected or buffered route and safer crossings—including for children riding through Gaslight.

The bond authorizes pedestrian and micromobility safety work, and the City’s resolution points to reallocating some street parking for dedicated mobility lanes. It does not name a Wealthy Street project. The safety benefit comes from the redesigned street and safe garage access—not from a garage stall by itself.

See NACTO’s separation guidance →

Read the bond language →

Build the full yes vision

A garage is the start of a more walkable Gaslight.

A yes vote moves a compact parking hub forward. The full vision pairs it with public access, a strong City-school partnership, and street improvements that make it safer to reach Gaslight on foot or by bike.

  • Shared responsibility for capital costs, operations, maintenance, security, and reliable public access.
  • Useful public parking with clear hours, fees, permits, event access, and wayfinding for visitors.
  • Well-planned traffic flow at Bagley and Lake, with signal operations and garage access designed for people driving, walking, and biking.
  • Clear full-life costs that show construction, borrowing, operations, security, future repairs, and each partner’s share.
  • Safer street connections with protected or buffered routes, crossings, delivery access, and accessibility.
  • Public results showing use, queues, access, and the street improvements delivered.

Questions before you vote

Straight answers for a stronger Gaslight.

Neighbors are raising fair questions about parking, costs, traffic, and safety. Here are direct answers from the public record—and why we support a yes vote.

Does the City’s parking study prove the garage is unnecessary?

The City’s study combines school lots, public streets, City lots, and private lots classified as open to the public. That broad inventory is not a count of convenient spaces beside Gaslight. The high-school lots were nearly full, and a selected set of nearby locations ran fuller than the total study pool at 3 p.m. on all three survey dates. A shared garage is the best way to serve school and downtown together while keeping parking compact.

City count, p. 18, and map and area tables, pp. 7, 19–22 · Progressive memo, pp. 1–3

Why wasn’t replacement parking in the 2023 school bond?

EGRPS described the 2023 bond as a school-facilities plan, centered on classrooms and building improvements. The City’s earlier 2018 study had concluded that area-wide parking was sufficient. Later City records say the high-school expansion and planned mixed-use development warranted a new look at parking. That broad supply finding was not a plan to replace spaces on the high-school site.

The public records reviewed do not identify a single reason or person responsible for leaving replacement parking out. They show that the school-site impact became clear as the design and construction schedule advanced. The City’s 2025 count found the four high-school lots 97.7% occupied at 1 p.m.; City materials forecast a temporary 139-space construction reduction, and the City Manager described a projected 71-space net loss after renovation without replacement parking.

EGRPS 2023 bond proposal · City parking history and construction impacts · City Manager’s 71-space estimate, reported by FOX 17

Is the $9 million bond only for public parking, with school parking already paid for?

The ballot authorizes up to $9 million in City borrowing for a public parking facility and related costs. The concept combines replacement school parking with public and community use. The City has described a 50/50 partnership; the June presentation is preliminary, and the final agreement will set each partner’s share. A shared project is stronger when both partners share the costs and the public can use the facility.

Bond resolution · June 23 joint presentation, slides 2–4

When can the public park there, and will it be free?

The concept is designed for school users, school-event visitors, and Gaslight Village visitors and workers. The City-school agreement will set the hours, fees, permits, and event-day access. Reliable public access is a core benefit of sharing the facility.

June 23 joint presentation

Does LOS F mean the intersection is unsafe or will be gridlocked?

No. Level of Service describes traffic delay; it does not measure crash risk or safety. FHWA says safety is not reflected or implied by LOS. WalkSafe’s linked PDF does not include the claimed grade or delay tables. The May presentation says traffic adjustments were analyzed and a Bagley/Lake signal was required, but does not publish the grade’s underlying analysis. Treat Bagley/Lake as a design challenge to solve—not proof that a shared garage cannot work.

FHWA guide, §7.1.2 · WalkSafe’s traffic page

Does the 30–60-minute estimate mean each student waits that long to exit?

No. Progressive’s November 2025 memo estimates a 30–60-minute post-school garage load-out period depending on structure size and use. That describes the period for garage traffic to clear, not the wait for each individual driver. It is a design issue the garage access and traffic plan must address.

Progressive memo, pp. 1–3

How could the garage help kids riding on Wealthy Street?

Moving selected curb parking into a shared garage can open room for a protected or buffered route and safer crossings for people biking and scootering. That—not the garage stall itself—is the safety benefit. The ballot authorizes pedestrian and micromobility safety infrastructure, and the City’s resolution supports reallocating some street parking for dedicated mobility lanes. It does not yet designate a Wealthy Street route.

Corrected bond resolution, pp. 2–3

Who pays for maintenance and security?

An April 2026 City email estimated operations and maintenance at $611 per space per year, or $130,143 annually for the earlier 213-space concept, excluding depreciation. The July concept has about 240 spaces, so the operating estimate will need updating. A clear City-school agreement will show how both partners share maintenance, security, and future repairs.

City operational-cost estimate · July 2026 concept update

Read beyond the summary

Sources worth opening.

Open the City, school, and federal records behind the case for shared parking and a more walkable downtown.

Keep Gaslight walkable as it grows

Vote yes for a stronger, more walkable Gaslight Village.

A shared garage is the best path to keeping parking compact, serving school and downtown visitors, and making room for safer streets. On November 3, vote yes to authorize up to $9 million in City bonds for public parking and related traffic, pedestrian, and micromobility improvements.

See what the bond covers